Pre Stressed Concrete Roof Panels



Recently we managed to get to a major milestone in our clay block home build when the first round of concrete roof panels went in to form the 3m high ceilings present throughout the majority of our home.


First Panel Landed

We have another similar day coming up once all steel work and concrete pour for the aforementioned stage has been completed. Engineering dictates that this has to be done before we can install the final block work to the vaulted (4m) wall height within the living room in the next few weeks.


Last Panel Landed

It was a huge day had by all and we'd like to extend our utmost appreciation to all those that helped get us there - you know who you are - we'll be seeing you at the roof shout when the next round of panels go on!

FIND ME HERE

Phone: 021 920 670

Address: PO Box 467, Taupo, NZ 3330

Emailcass@cassandraswan.co.nz

CONNECT WITH ME
  • Grey Pinterest Icon
  • Grey Facebook Icon
  • Grey Instagram Icon
STAY IN THE LOOP!
HELP

© 2020 Cassandra Swan Interiors

0